immediately and evacuation procedures started. If it is found that the alarm activated
erroneously and an all-clear is given, ATC-Zero can be cancelled. The safety of Air Traffic
Employees is the direct responsibility of Air Traffic management, not TechOps. POC: Mike
Odryna
Public Access Defribulator Program – If your facility needs PAD training, send an email to 9-faa-
cpr-aedtrainingreport@faa.gov or follow the link below to obtain more information regarding
the program:
https://employees.faa.gov/org/linebusiness/ato/operations/technical_operations/atc_facilities
/eosh_services/osh/faid/. POC: Mike Odryna
Current Facility issues being worked by the OSHA Committee and others:
FAY: Fumes NEW: IAQ Mold, Build back, New HVAC, Patio
Drainage
PAQ: Asbestos ARR: Overall Facility Condition
GRR: Odor, ASR Contamination PHF: Mold/IAQ
HSV: IAQ, Fumes FSM: Water Intrusion, IAQ
DSM SSC Office: Comprehensive Mold
Evaluation
SGF ATCT: HVAC Project
GTF: Mold PTK: Mold Remediation, tower Closure
CRP: IAQ Tallahassee: Water Leaks
ATL Tower: Elevator Fire PHL: Overall House Keeping, Rodents
ABE: Overall House Keeping, Flies BRW: Ongoing REHAB, Mold, Open Walls,
Broken Walkway
MFD: Mold Remediation Minneapolis TRACON: OSHA Inspection
PIA: Water Mold, Overall facility condition,
Asbestos
OMA: water intrusion, mold, window
replacement
FMY: IAQ, Roof Project LEB: Water Quality
GSO: Water Intrusion LAX: Mold & Water intrusion Issues
LGA: Siding, Contingency Planning RSW: Water Intrusion
DSM: Cab Roof Water Intrusion LIT: Mold Remediation
KET FSS: Facility REHAB PUB: Breakroom build
DWH: Failed Water Test MDT: Flies
Great Lakes Regional Office: Asbestos
removal, Water testing
MIA: Lead in water
F11: Asbestos Floor Tile Abatement MYR: Improper Wiring
DLH: Mold MFD: Mold
ZHU: Water Intrusion PIT: Water Leaks