NATCA Bookshelf

CFS Book 2024 Book

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/1526622

Contents of this Issue

Navigation

Page 29 of 51

30 N AT I O N A L A I R T R A F F I C C O N T R O L L E R S A S S O C I AT I O N FE/FHC FE FHC FHC FHC FE FE FE FHC FHC FE FE FE FE FE FE FE FHC MENS WOMENS SERVICE CORRIDOR SERVICE CORRIDOR SERVICE CORRIDOR FREIGHT DOOR SERVICE CORRIDOR FREIGHT DOOR FREIGHT DOOR BUILT IN REGISTRATION BUILT IN REGISTRATION FOOD SERVICE CORRIDOR RAMP EXIT FROM EVENTS CENTER 24' CLEAR SPACE AT ALL TIMES EXIT 6' DO NOT COUNT AS EXITS EXIT FROM EVENTS CENTER ONLY EXIT 6' 6' 6' 6' 6' EXIT 6' 6' 6' EXIT 6' 6' EXIT 6' 6' EXIT EXITS NOT AN EXIT 3' 3' EXIT 6' 6' 7' 7' EXITS EXIT 6' EXIT 6' EXIT 6' 6' 6' EXITS 6' 6' EXITS 6' 6' 3' 3' EXIT EXIT EXIT EXIT 3' 3' 6' EXIT 6' EXIT SMART WALL SMART WALL LOUNGE G H I ENTRANCE A B C D E F BRONZE 1 217 310 316 613 615 617 710 712 714 716 B1 B4 B5 B6 B9 B10 B11 B12 B13 B14 B15 B16 NATCA CHARITABLE FOUNDATION THEATER STAGE 611 516 215 312 314 411 513 509 114 407 804 414 408 211 223 322 221 416 623 B7 605 621 B2 B3 704 706 720 723 814 111 205 ARCHIE LEAGUE TICKETS TO BE USED FOR A PARTIAL VIEW OF EVENT FLOOR PLAN Prod. Branch: LAS VEGAS | Project #: 529763 | File Path: C:\_Vault\Designs\_Projects\C\Communicating for Safety\NATCAC2409\Event\Floor Plans\NATCAC24.dwg | Tab Name: Clean L12674966 FP CUSTOM Revision Date: Scale: Revised By: Account Sales: Line Item: #12674966 Drawing Started: Started By: Account Management: 8/21/2024 8/19/2024 ---- ---- TRACY WALKER TRACY WALKER COMMUNICATING FOR SAFETY - 09/16/24 - 09/18/24 HORSESHOE LAS VEGAS - GRAND BALLROOM - LAS VEGAS, NV Disclaimer - This floor plan is preliminary and subject to change pending review and official approval by all authorities having jurisdiction. Every effort has been made to ensure the accuracy of all information contained on this floor plan. However, no warranties, either expressed or implied, are made with respect to this floor plan. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of an exhibit, it is the sole responsibility of the exhibitor to physically inspect the facility to verify all dimension and locations. © Copyright 2024, Freeman, all rights reserved. Confidential and Proprietary - the information contained herein is the proprietary information of Freeman and by accessing the information, the recipient agrees to keep the information confidential and not disclose it to any third party without the prior consent of Freeman. Recipient also agrees to only use the information for its internal evaluation purposes and for no other purpose, without the prior consent of Freeman. CFS E XHIBIT HALL

Articles in this issue

view archives of NATCA Bookshelf - CFS Book 2024 Book