• Human Factors presented several options for a recall button that would reside on
the toolbar of the TSD. This would bring the Departure Viewer window to the
front of the display if selected.
• The ERAM team was testing PDRR/ABRR for the ERAM functionality. That
team wrote up some issues for ERAM to fix. The deployment team sat in on the
recap and discussed their findings.
• The Deployment team ranked the severity of issues found with testing the Route
Amendment Dialogue (RAD) which is the tool that allows the TMC to submit
PDRR/ABRR amendments.