NATCA Bookshelf

National Office Week in Review: April 20, 2016

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/669670

Contents of this Issue

Navigation

Page 17 of 28

• (866) 276 - 5908 o POC: Mike Odryna, Domi nic Petrelli, and Nicole Vitale • OSHA Committee Webinar: o The webinar was held on February 25 th and was attende d by more than 30 individuals. Stay tuned for t he next webinar. o POC: Mike Odryna, Geoff Bacci • Hearing Conservation Program (HCP) AVS/AIR: o NATCA signed an MOU with the agency to define a working relationship between NATCA and AIR to develop a hearing conservation program. o POC: Mike Collins, Mike Odryna, Domi nic Petrelli, and Nicole Vitale • NATCA Academy OSHA Class o The NATCA OSHA class will be held in Atlanta May 10 - 11. This class i s currently full with 16 participan ts. Watch the NATCA Academy website and the NATCA OSHA Committee Facebook page for future c lass announcements. o POC: Ham Ghaffari, Carolyn Kamara, Mike Odryna • Current Facility issues being worked by the committee. • FAY: Fumes • PHX: Elevator Reliability • SAT: Mold/IAQ • FAI/ATCT: Roof Replacement • FNT: Odors • LAX/MIDO: OHSA Inspection/Citations • Alask a FSS: OTZ Housing/FAI HAVC - ROOF Replacement • ARR Overall Facility Condition • BOI: Elevator Reliability as second means of egress • ILG: Mold/IAQ • GRR: Odor • ORH: Water Leak • BGM: Water Leak • PNS: Water Leak • SEE: Water Intrusion • SGF Mold/IAQ • ANC ATCT: Articl e 53 Investigation • ZAN: Seismic Upgrade RUNWAY SAFETY : Bridget Gee (DFW) is the Article 48 Representative for Runway Status Lights (RWSL) and also the National Runway S afety Action Team (RSAT) Lead. Her update is below. • Runway Status Lights (RWSL): o ORD : Being conducted in three phases: Phase 1, Runway 10L/28R, is scheduled to come online April 27, 2016. Phase 2 and 3 are scheduled to come online 2017. Phase 1 (10L/28R): Pre - IOC briefing conducted 4/12/16. Initial Operating Capability (IOC) scheduled fo r 4/27/16. Phase 2 (10C Enhancement) - Airport scheduled to start work Spring 2016. Phase 3 (9R Enhancement) - scheduled to begin early fall 2016. o DTW: Continued hardware issues are attempting to be fixed and plan is to have system back online by the end o f the month. Commission should take place within 30 days after that.

Articles in this issue

view archives of NATCA Bookshelf - National Office Week in Review: April 20, 2016