NATCA Bookshelf

National Office Week in Review: May 18, 2016

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/681981

Contents of this Issue

Navigation

Page 23 of 23

scheduled to be completed by June 2017 which should not impact TAM R deployment at this facility. The TAMR ELITE Initial Si te Survey occurred the week of May 9. o Pensacola, FL (P31) - An ongoing issue with primary only false targets when opening in fusion. Several attempts have been made on the ASR - 11 systems feeding P31 to fix this issue as well as changes to STARS adaptation . While there have been improvements, there have been numerous days where the clutter has been unmanageable. Several tel co n s have occurred with various groups to push progress towards a better presentation. After two parts are installed in the PNS rada r to fix a weather problem, AJW - 147 and TSOG will re - optimize the PNS radar, already having several parameters mapped out for changes to improve the performance. o Potomac TRACON (PCT) - Several issues with false targets had been identified by TSLE and passe d along for evaluation. The MRB radar was providing some lengthy beaco n false tracks intermittently. After further investigation , it was discovered that MRB was configured incorrectly. The correct PRF was installed and the intermittent false tracks have vanished. Additionally, the DCA radar was also providing a number of reflec tions in close to the airport. These were caus ing "zoomers" on the displays. Between an adaptation change at the radar as well as the installation of the new STARS R3C Drop 7s s oftware, initial analysis by OSF and TSLE appears that t he zoomers have been rectified.

Articles in this issue

view archives of NATCA Bookshelf - National Office Week in Review: May 18, 2016