NATCA Bookshelf

National Office Week in Review: June 15, 2016

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/693369

Contents of this Issue

Navigation

Page 15 of 23

o 7 CSA f acilities (SAT, AUT, BTR, EVV, ELP , C90, ORD) are in design phase. o C90 c onstruction scheduled to finish in July 2016. o POC: Mike Odryna, Dan Sherritt Fire Drill Requirement o All FAA employees are required to participate in a f ire drill annually. Ask your local management for the status of f ire drills at your facility. o POC: Mike Odryna Current Facility issues being worked by the committee and others. o FAY: Fumes o PHX: Elevator Reliability o LAK: IAQ Mold o FAI/ATCT: Roof Replacement o FNT: Odors o YNG: Roof Replacement o Alaska FSS: OTZ Housing/FAI HVAC - ROOF Replacement o ARR Overall Facility Condition o BOI: Elevator Reliability as second means of egress o ILG: Mold/IAQ/Asbestos o GRR: Odor, ASR Contamination o DAL: Water Tank Leak o Great Lakes Regional Office: Asbestos/Construction o PNS: Water Leak o NWM Re gional Office: Water Quality Issues o SGF Mold/IAQ o ANC ATCT: Article 53 Investigation o ZAN: Seismic Upgrade o DSM SSC Office: Comprehensive Mold Evaluation o FSM: Water Intrusion, IAQ o NEW ATCT: Mold/IAQ o SGF ATCT: HVAC Project REMOTE TOWER: Kieron Heflin ( IAD) represents NATCA in accordance with Article 48 on the Leesburg Remote Tower initiative. Mr. Heflin forwarded the information below for this week's update. o Mr. Heflin had numerous meetings and tel cons to continuously review and comment on SAAB/VSAATS E valuation plan Phase 1A for the R - twr at Leesburg airport. o Mr. Heflin had a meeting to review and comment/amend the Evaluation forms that would be recommended to Saab for the Phase 1A passive testing for the R - twr at Leesburg airport . T hese documents were produced by the FAA's Human Factors group. o Mr. Heflin had a meeting with SAAB and all the interested parties to discuss in detail Evaluation plan Phase 1A for the R - twr at Leesburg airport and now are waiting for the revised addition of the plan. o Mr. Hefli n had a meeting to review and comment/amend the Concept of operations for the R - twr at Leesburg being put forth by Saab/VSATS. o Mr. Heflin had a meeting with Saab/VSATS and all the interested parties to discuss the Concept of Operati ons for the R - twr at Lee sburg. We are awaiting the amended version or the Concept of Operations.

Articles in this issue

view archives of NATCA Bookshelf - National Office Week in Review: June 15, 2016