NATCA Bookshelf

National Office Week in Review: June 22, 2016

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/696483

Contents of this Issue

Navigation

Page 13 of 19

The National Committee will hold a training class at Atlanta ARTCC August 23 - 25. We will announce FY17 classes sometime in early September. If your facility is need of a new committee member or is currently without one, contact Professional Standards at ps@natca.net and we will work to schedule a training slot. For the most up to date data on the success of the program, go to: ht tps://docs.google.com/spreadsheets/d/1AH_lu2lv7pnyvePzUjKdebN0DccYoVRCpuBb _XLERrE/pubhtml?gid=1&single=true AIRSPACE TECHNICAL DEMONSTRATION 2 (ATD - 2): Pete Slattery (CLT) represents the membership as the Article 48 Representative for ATD - 2. His report for this week is below. On Thursday June 16th, Mr. Slattery met with members from NASA, FAA ANG, FAA AJM, FAA AJV, and FAA AJR in Washington , D . C . to discuss ATD - 2 and its integration with existing FAA technologies such as Traffic Flow Management System ( TFMS), Time Based Flow Management (TBFM) and electronic flight data (EFD). A key topic was the NASA proposal to integrate the ATD - 2 surface system (TFDM stand - in) with TBFM IDAC. This proposal gained support to proceed with more detailed planning among the required parties targeting identification of the software changes required to enable this in TBFM release 4. 7 scheduled for Spring of 2017. If accepted, this integration approach will allow direct electronic negotiation of APREQs with ZDC from CLT's ATD - 2 surface system with minimal impact to ZDC workload. Another key area of discussion was the current status of AEFS software. Specifically dates by which a readiness decision needs to be reached to successfully support ATD - 2 needs. If AEFS is not deemed s atisfactory for use in ATD - 2, NASA may explore other EFD options for use at CLT. This deci sion will come later this year. Finally, live data is flowing into the CLT ATD - 2 lab. This capability allows NASA to display all existing ATD - 2 data on its prototype user interfaces. NASA will be formally opening its ATD - 2 lab at Charlotte Douglas airport on June 24th. See th is tweet for more info about NASA Administrator Bolden's visit to the lab . Engineering shadow evaluations will begin occurring at the CLT ATD - 2 lab during the month of July. Controller HIT Ls will follow soon thereafter. RNAV and PERFORMANCE BASED NAVIGATION (PBN) : Bennie Hutto (PCT) is the Article 48 Representative for RNAV and PBN criteria work. Mr. Hutto's report for the membership is below . NextGen Integration Workg roup (NIWG) PBN A briefing to the NAC was scheduled for June 17, 2016, for their approval of the recommendations provided by this workgroup, which included se vera l of the topics listed below. Established on Departures (EoR)

Articles in this issue

Links on this page

view archives of NATCA Bookshelf - National Office Week in Review: June 22, 2016