As of November 2017 over 1.8 million flights have received a CPDLC clearance and
delivered benefits to over 262 million passengers.
Over the last six months it is estimated that over 66,000 minutes of time on frequency
was saved and that more than 2,700 possible hear back/read back errors were
prevented.
It is also estimated that the CPDLC delivered over 10,000 minutes of delay savings.
None of these benefits could have been realized without the dedicated work of all of our
NATCA Subject Matter Experts and the Local Article 114 teams at the facilities.
Collaboration with the agency is showing a benefit to all. Most of all though, these
benefits would not be realized without the hard work and dedication of all the NATCA
Bargaining Unit Controllers in the field. Thanks for all you do.
ENROUTE AUTOMATION MODERNIZATION (ERAM)
Julio Henriques (ZNY) leads the ERAM efforts for NATCA. Rex Jackson (ZDC) provides
this update.
All 20 ARTCCs have completed transition to EAD700 ERAM software. ABRR/PDRR
continues to be turned on nationally, with nine sites remaining. The remaining nine sites
will be completed by April 2018.
The En Route Automation Workgroup (ERAW) decided on an EAD700 filed fix for the
following items:
Issue
ID
Change
Type
Associated
PRs AIMS Title
183121 SWPR E80732
ZTC_ERAM: ZTC: Change DAM to avoid processor
reboots due to DSI_PROC errors
184982 SWPR E81342
ZOB_ERAM: New Linux Ds flight strip printer errors
upon cutover
185577 SWPR E81428
National ERAM: ZAB Linux failure scrollbar hidden uses
device type instead of device number
185674 SWPR E81471 ZOB_ERAM: Multiple Linux D-Position DVu Failures
176078 PRED E78750 ZID_ERAM: ZID ERAM EAD600