Stars Enhancement 2: 4th Line The draft use case was discussed; it describes a new functionality for 4th line data to be coordinated between ERAM and STARs. This is the first of four use cases for new functions between ERAM and STARs. ER 184929 Emergency Airport Runway Length The team discussed and reached consensus on the problem statement, its desired behavior is to change the current method of rounding to truncation in hundreds of feet for the National Adaptation Runway Length Data. ENTERPRISE-INFORMATION DISPLAY SYSTEM (E-IDS) Amanda Hodge (ZOA) is the Article 114 Representative for Enterprise-Information Display System (E-IDS) work. Ms. Hodge's report for the membership is below. Background: The Enterprise Information Display System (E-IDS) project aims to replace all existing IDSs in the NAS, providing the Agency with one enterprise solution across facility types. While some customization is necessary and should be available, one system will reduce overall costs for upkeep and training, and resolve the upcoming end- of-life issues we have with our current IDSs in the field (IDS-4, ERIDS, etc.). The project is working towards finalizing requirements by the summer of next year, with a contract scheduled to be awarded in 2019. Due to holiday leave and moratoriums, there are few updates to report on the project. The scoping document governing the future use of Cadre and SMEs is at HQ for final review. After that is finalized, we can move forward on future E-IDS SME and Human Factors work. Upcoming activities: Tower and TRACON demo work with SMEs (ongoing) En Route focus group and demo work with SMEs (ongoing) Human Factors workgroups NATCA, FAA, and PASS FLIGHT DATA INPUT OUTPUT (FDIO) Corey Soignet (LFT) is the FDIO Article 114 Representative. Also included in Mr. Soignet's duties is Article 114 representation for the Electronic Flight Strip Transfer System (EFSTS). Mr. Soignet forwarded the information below for the membership. FDIO The first article testing is still on going. The FDIO Team is now dealing with numerous software tweaks to the new printer. To date, BOCA and the FDIO Team are correcting all issues then multiple tests are done to ensure the printer is working properly. The key site install was slipped back again to mid-2018. The plan is to have five key sites consisting of a tower and TRACON and, due to their unique printer demands, we are also planning on using Honolulu, Alaska, and Puerto Rico. EFSTS There is nothing to update at this time. FIDI There is nothing to update at this time.