A publication of the National Air Traffic Controllers Association
Issue link: http://natca.uberflip.com/i/937821
publication for these procedures was February 2019 but DataComm, additional community request, and environmental process will probably push that date later in 2019. CVG Project The CVG project was started in mid 2015 and for the third time has been put on hold by HQ. We have been given a list of projects that will be funded through PBN for 2018 and CVG is not on the list. The TVT VOR was to be removed during our CVG project to meet the VOR MON decommissioning in FY18. The Eastern Co-Leads will work to remove TVT from the ROCKT SID in FY18 via the abbreviated amendment process while the rest of the project waits. NEC (North East Corridor) PBN work in the New York and Philly area will be worked under the NEC project. The SID and STAR work for Sector 85/86 in ZNY is continuing with a milestone of conceptual designs prior to March 31, 2018. The workgroup for ZNY conceptual design is scheduled for the week of Feb. 12. We are working with N90 to schedule dates for SID and STAR design work for JFK and EWR. ACRP has been re-scoped between Florida Metroplex and NEC. The Q and Y-routes that were developed under ACRP in ZDC, ZNY, and ZBW will be pulled into the NEC PBN work. The Q-routes in NEC will be worked closely with the PXT STARs. The proposed new traffic flows on the Qs and the connectivity with the STARs is critical in ZDC airspace. PXT VORMON Project We have funding and approval to begin work on the PXT VOR decommissioning. This project began in 2016 but do to funding concerns in 2017 it was on hold for most of 2017. The project includes nine STARs and 13 T-routes. STARs are being developed or amended for LGA (2), EWR (2), TEB (2), PHL (2) and DOV (1). The 13 T-routes will provide PCT and ZDC route structure around the Washington/Baltimore area; other restricted airspace and congested airspace between BWI and PHL. Projects waiting to publish PLB is VORMON generated – T705 between ZBW and NAVCANADA 2018 publication; Bermuda – Amendment to one STAR with additional waypoints to aid in non-radar separation; All other projects in Eastern have been put on hold until June 2018 when AJV-14 will reevaluate priorities and funding. Projects on hold or waiting prioritization in Eastern; • CVG – Atlas Air request, Amazon, Delta and SWA supported project; • T-294 extension – ZTL request for TDG/EWA VOR MON project; • ROA – RNPs, FEDEX request for safer operation through terrain; • TJSJ SIDs & STARs – Data Comm generated project; • ZME Q-routes – 8 new routes and 10 amended;

