NATCA Bookshelf

National Office Week in Review: March 7, 2018

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/952002

Contents of this Issue

Navigation

Page 13 of 37

of the meeting to Trips and that he "did not support implantation unless Trips were up and running first," and quoted that he spoke for all of industry on that matter. Ron and I attempted to explain the issues driving the implementation date and that if we missed 9/13, the next available date would likely be mid-2019 and that would jeopardize the project. The discussion became non-productive and I (as NATCA) called the meeting and walked out for lunch. The afternoon meeting was able to stay focused on the specific agenda that was set prior, and we were able to accomplish what we were there to do. The team coordinated the new implementation plan with NAV Canada this past week. They can support the plan but will need to change the previously coordinated production slots originally set in the event that problems with the procedures need to be corrected. The new chart date will likely be in August of 2019. Everything else involving NAV Canada appears to be on target. We are still working with Gary Fisk and Ron Singletary on updates on the safety study that was conducted at DTW for the operation of trips. We were told on 2/7 that the document of the study was in the "review and signature stage," and that we should hear something soon. I have been in touch with the RVP/ARVP to see if they could put some pressure on their counterparts to get this thing moving so we can start to plan to go or no go with trips. Submitted by Michael Taylor CLE/DTW Article 114 D & I Liaison. SoCal Metroplex The SoCal Metroplex Team Provided the Western Pacific Regional Administrator and the OSG, analysis for Long Beach Airport reference noise concerns near Huntington Beach, regarding continuing legacy noise concerns. The team also provided additional information to the RA Staff and HQ on meetings with Congressman Rohrabacher. Other accomplishments: • Reviewed the draft response for the LA Roundtable; letter dated Oct. 1, 2017. • Reviewed and provided analysis for the Malibu Mayor letter reference noise concerns Reviewed and provided analysis and comments on Congressman Lieu letter. • Provided the Regional Administrator Staff and HQ a draft PowerPoint for Thousand Oaks and Newbury Park. Awaiting comments from RA Staff. • Coordinated with AIS on procedures that are scheduled to be published on March 29 and May 24. Provided the Regional Administrator Staff and HQ the reasons for procedural slips on the March 29 publication date. ZLA and SCT have been in the final preparation stages for the March 29 and May 24 implementation dates. ZLA has begun the process to move forward with the implementation of the Sectors 54 and 55 redesigns. Planning, training, GSGT changes, ERAM automation, and support for the implementation has begun. The redesign was required due to the complexities experienced during inclement weather.

Articles in this issue

view archives of NATCA Bookshelf - National Office Week in Review: March 7, 2018