A publication of the National Air Traffic Controllers Association
Issue link: http://natca.uberflip.com/i/988571
ER 191218 CS 0 Command The ER was discussed by the team, the issue is the implications of an unintentional use of the CS 0 command, opens all sectors, and the possibility of adding a logic check to this message. The task team will write a problem statement for the ER and present options at a future meeting. DataComm Use Cases Updates and briefings to Initial and Full Services use cases have been sent to the team for review. There will be a final discussion and consensus on all of the use cases at the June National User team meeting. ER 184496 ABRR/PDRR Restricted Airspace The team discussed and reached consensus on the problem statement; the desired behavior is to provide each center with the ability to choose via adaptation, routings (ADRs, ADARs, and AARs) that are not to be overridden by an PDRR/ABRR reroute. ER 183395 Changes to FALCON The team discussed and reached consensus on the problem statement; the desired behavior is to ensure that ERAM CHI changes will be carried through completely to support FALCON replays. A use case is planned for this ER. FLIGHT DATA INPUT OUTPUT (FDIO) Corey Soignet (LFT) is the FDIO Article 114 Representative. Also included in Mr. Soignet's duties is Article 114 representation for the Electronic Flight Strip Transfer System (EFSTS). Mr. Soignet forwarded the information below for the membership. FDIO The first article testing is still on going and the new printer is in operation at the first key site ACY. ACY has helped the FDIO team identify an issue that was hidden in the programing code. That issue was quickly corrected and after further testing was reinstalled in ACY and no further issues have been discovered. The controllers have commented on the quality of the font on the new printer along with it being noticeably quieter. The FDIO team installed the new printers in MCO/F11 and they reported back nothing but positives. MCO/F11 will continue to test the printers over the next couple of weeks. After successful key site testing at both ACY and MCO/F11 we will then move forward with the additional key sites Honolulu, Alaska, and Puerto Rico for their unique printer requirements. EFSTS MEM Tower is scheduled for the EFSTS Keypad Replacement on June 11-15, 2018. MEM Tower will be the last facility to install the new EFSTS Keypad Replacement. FIDI There is nothing to update at this time. INTEGRATED DISPLAY SYSTEM REPLACEMENT (IDS-R) Richie Smith (N90) leads NATCA's efforts on the IDS-R project as the Article 114 Representative. Below is Mr. Smith's report.