NATCA Bookshelf

National Office Week in Review: January 24, 2018

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/931967

Contents of this Issue

Navigation

Page 20 of 28

Regional OSHECCOMs The NATCA Air Traffic Regional Reps and Region X reps attended their respective Regional OSHECCOM meetings throughout December and January in all the Legacy Regions. Minutes from the Regional OSHECCOM meetings can be found at OSHECCOM KSN Site NATCA Rep. OSHA Training Mike Odryna met with the agency to update NATCA Rep training requirements and offerings. While the current training list is still valid, an updated list of training available for all NATCA OSH Reps will be available ASAP. Furthermore, an NATCA OSHA class will be scheduled for this year. POC: Mike Odryna, Dominic Petrelli ATC-0 Determination ATC-0 declaration at an Air Traffic facility is the responsibility of AT Managem ent/CIC not TechOps. Example: If the Fire Alarm activates, ATC-0 should be declared immediately and Evacuation procedures started. If it is found that the alarm activated erroneously and an all clear is given, ATC-0 can be cancelled. The safety of Air Traffic Employees is the direct responsibility of Air Traffic management, not TechOps. POC: Mike Odryna PCT Housekeeping Issues The Agency, along with NATCA, have started to develop a strategy to ensure the cleaning requirements set forth in the janitorial contract and TechOps requirements for equipment cleaning are adhered to. POC: CJ Jacques Public Access Defibrillator Program On May 1, 2017, a new PAD Program subcontractor was contracted to replace Emergency University. Contractor, website, and training info will be coming out shortly. POC: Mike Odryna Current facility issues being worked by the committee and others. FAY: Fumes NEW: IAQ Mold Build back PAQ: Asbestos CMI: Roof Replacement, Mold Remediation, and Asbestos Floor Tile Abatement GRR: Odor, ASR Contamination ARR: Overall Facility Condition NWM Regional Office: Water Quality Issues PHF: Mold/IAQ HSV: IAQ, Fumes NWM Regional Office Design DSM SSC Office: Comprehensive Mold Evaluation FSM: Water Intrusion, IAQ GTF: Mold SGF ATCT: HVAC Project CRP: IAQ, Exterior Door Broken, SFAS Out of service Nome: Asbestos in the floor tile mastic, REHAB DTW: IAQ Investigation PTK: Mold Remediation

Articles in this issue

Links on this page

view archives of NATCA Bookshelf - National Office Week in Review: January 24, 2018