NATCA Bookshelf

National Office Week in Review: September 2, 2015

A publication of the National Air Traffic Controllers Association

Issue link: http://natca.uberflip.com/i/565556

Contents of this Issue

Navigation

Page 22 of 28

§ 9/18/15 – ATL City Airport Manager Briefing § 9/28/15 – Meeting with ATL City Airport Mgr. o Submitted by Joey Tinsley (ZTL), Atlanta Metroplex Co - Lead · P hoenix OAPM Design and Implementation o 8/25 - 27 o Phoenix TRACON and Tower o Continued design package development o TARGETS clean up work o Q - route telecom with ZLA and ZAB o Travel logistics for P50 o Executive summary development o Meeting with STAR's G4 phase one team at CHD about project overlap o Review of initial environmental documentation o Project tracker update o Project review of open issues o Mark Ostronic Phoenix Metroplex NATCA D&I Lead · SoCal Metrople x o The POCs did not travel; Rob Henry (FAA Co - Lead) and Mr. Gonzalez met at the Regional Office. o Finalized the talking paper for the Regional Administrator for utilization during meeting with local elected officials about SoCal Metroplex. The docume nt contains background and status information and will be posted on the SoCal website. o Work continued to ensure the revised Publication Schedule is updated on the NSSP site. o Program Office approved independent utility to correct discontinuity issue s between LAS legacy procedures and SoCal Metroplex procedures. TARGET files and EA analysis need to be completed so that the amended procedures can be included in the 5/26/16 publication cycle. o Coordinating with OKC to assist in developing a SMO RWY 0 3 approach for Category A & B aircraft that was dropped from development. o Finalized the letter that was included in an email sent to local elected officials as specified by the Manatt Consultants. The email is for an invitation to participate in a gove rnment outreach on SoCal Metroplex to be conducted on Sept 1, 2015 at the Regional Office. o Provided a PPT with information on 2012 traffic flow, volume, current and Metroplex projections as requested by the representative of the 53 rd District Congresswoman Susan Davis' Office. o SCT DEL SMEs completed review of chart cycles 2 and 3. o SCT POCs have completed about 90% of the training plan. o Automation specialists for both facilities met at SCT to address automation issues. Node reports for SCT Airspace were reviewed. Identified the need for at least 11 new FAVs. Created RamView files of SoCal procedures. Identified missing airports in the test NASDE. Identified issues during LAX configuration changes. Discussed fix/pair, SCT str ip posting and T - route requirements. o ZLA POCs conducted a tour of the facility and answered Metroplex questions to Miguel Franco, Deputy Chief of Staff for the 29 th

Articles in this issue

view archives of NATCA Bookshelf - National Office Week in Review: September 2, 2015